Tuesday, March 03, 2026

When the CMD exploded- and So did I

When the CMD Exploded — and So Did I


Kathalgudi, 1994 — Steam, Gas… and Temper

In 1994, when I took charge as GM (Projects), BHEL Eastern Region, I believed I had developed a reasonably thick skin. After commissioning thermal stations across the country, I thought I understood pressure — mechanical and managerial.

Kathalgudi corrected that assumption.

This was NEEPCO’s first combined cycle power plant at Kathalgudi — a prestigious project funded under the Japanese OECF loan. Our partner was Mitsubishi Heavy Industries (MHI). Gas turbines, steam turbines, HRSG — jointly supplied by MHI and BHEL.

Mitsubishi was performing like a disciplined samurai.
We, unfortunately, were struggling with site coordination and execution delays.

And the review meeting was to be held right there — in BHEL’s site conference hall at Kathalgudi. On the battlefield itself.

The Review That Became a Trial

The hall was full — senior officers from NEEPCO, MHI, and BHEL. The atmosphere was formal, but tight.

Chairing the review was Mr. Das, CMD of NEEPCO— a senior IIT Kharagpur man, much my senior in experience and stature. It was my first interaction with him.

I had joined Eastern Region barely two months earlier. Our seasoned site in-charge, SNS, had been stationed there for two years and had even toured Japan at MHI’s works. I was confident the technical aspects would be properly represented.

The meeting began smoothly.

Mr. Das was generous in his praise for Mitsubishi.

> “Excellent planning. Exemplary discipline. That is why Japan funds such projects.”



I relaxed slightly.

Then he looked up sharply.

> “Who is in-charge of BHEL here?”



I stood.

“Sir, I am S. N. Roy.”

That introduction acted like ignition in a combustion chamber.

Without giving me an opportunity to explain ground realities, he launched into a fierce criticism.

> “Shoddy execution! No seriousness! Repeated delays! This is unacceptable!”



I attempted politely:

> “Sir, if I may explain the constraints—”



But he did not allow a word.

Then came the statement that changed everything.

Turning to NEEPCO’s GM, he said:

> “Stop further payments to BHEL until performance improves.”



That was not just criticism — that was operational suffocation.

I have endured harsh reviews before. But denying payment without hearing our position? That struck at institutional dignity and practical reality.

I waited for him to finish. I allowed the steam to escape fully.

Then I replied — calmly, but firmly:

> “Sir, if payments are stopped, we cannot pay our agencies. If that is the decision, then perhaps the intention is not to complete the project. In that case, we may have to close our operations.”



You could hear the silence settle like dust after a blast.

He was clearly not accustomed to being answered back — especially by someone he probably viewed as a supplier rather than a partner.

His face tightened. Papers were gathered abruptly.

> “This is insubordination!”



And he walked out of the conference hall.

After the Storm

For a few seconds, nobody moved.

Then senior NEEPCO officers quietly approached me.

> “Mr. Roy, well said.”
“Someone had to point out the practical side.”
“We were surprised at his hostility.”



It appeared the issue was not purely technical. Sometimes authority seeks compliance more than clarity.

But the day’s drama was not over.

Dinner — The Second Act

As per tradition, we hosted a dinner in the evening for NEEPCO, MHI, and our officers.

When Mr. Das arrived, I went forward to receive him.

He looked through me as if I were invisible.

I smiled. Engineers develop insulation early in life.

After a few pegs, however, insulation failed.

He began searching for me in the gathering.

> “Roy! You think you are very smart?”



His voice was loud, animated.

My own temperature began rising again. Before I could react, GM Barkatoki of NEEPCO leaned close and whispered in my ear:

> “Mr. Roy, please ignore him. When he drinks, he doesn’t know what he is doing.”



That whisper probably prevented a second explosion.

Our senior colleague Mr. B. P. Dey tactfully moved beside him and gently steered him toward the exit, almost like taking a vibrating machine safely offline.

Once his car left, the mood changed instantly.

NEEPCO officers surrounded me — laughing.

> “Mr. Roy, this is always the last scene after a few pegs!”
“Today you were the unfortunate co-actor.”



Apparently, my response during the meeting had bruised his ego, and the dinner was his attempt at retaliation.

Fortunately, within two months he retired.

A Different Leadership

Mr. Katoki took charge thereafter — another IIT Kharagpur man, but entirely different in temperament.

Measured. Professional. Solution-oriented.

Our interactions were constructive. Issues were discussed, not dramatized.

The project regained momentum and steadily moved toward scheduled completion.

At that time, another uncertainty loomed — the shadow of ULFA activity in Assam. There were whispers, concerns, risk assessments.

I once expressed my apprehension to Mr. Katoki.

He smiled reassuringly.

> “Don’t worry, Roy. Through mediators, I have explained to them that this project will bring prosperity to Assam. Stable power means industry, employment, development. Even they understand that.”



That quiet confidence carried weight.

Management Reflections — From a Controlled Explosion

Looking back, I admit I lost my cool — but only after restraint had been exhausted.

Kathalgudi taught me:

1. Let anger exhaust itself before responding.


2. Never allow financial throttling to be used as intimidation.


3. Authority without listening weakens institutions.


4. Temperament is as critical as technical competence.


5. Projects run on trust as much as on turbines.



In engineering terms, that day was a pressure test.

The system oscillated. The safety valve lifted. The fuse nearly blew.

But ultimately, stability was restored.

And the Kathalgudi combined cycle plant did come online — not merely with gas and steam — but with mutual respect restored and relationships reset.

Sometimes leadership is not about avoiding confrontation.

It is about knowing when to stand firm — and when to step back — so that the larger project, and the larger purpose, can move forward.

Friday, August 22, 2025

Building bridges beyond the table : Lessons on Customer Relationship Management



Building Bridges Beyond the Table: Lessons on Customer Relationship Management

Customer relationship is not just about contracts, negotiations, and project deadlines. It is about building trust, respect, and sometimes even friendships that last a lifetime. During my long career in Indian Oil Corporation, BHEL, and later in the private sector with Techno Electric Engineering, I experienced firsthand how cultivating deep personal bonds with customers and stakeholders can help overcome the most complex challenges.

In my view, customer relationships are not built in boardrooms or through formal agreements alone. They are forged on the ground, in moments of crisis, in the willingness to go beyond one’s defined role, and in the shared determination to complete a project despite all odds. When both sides align themselves to the common goal of project completion, they transcend the narrow boundaries of “client” and “contractor” and begin to act as true partners.


Early Lessons – Panipat (Haryana Electricity Board)

My journey with customer relationship at project sites began at the Panipat Thermal Power Station, where Mr. G. P. Sood, the Chief, became like a mentor to me. He openly admitted that his expertise lay in hydropower, not in thermal plants. This honesty created an instant bond of trust. I acted as his technical advisor and took decisions—even flouting certain BHEL restrictions—to ensure the plant ran during Haryana’s acute power shortage. That experience taught me that customer trust grows when you prioritize their problems over rigid rules.


Brotherhood at Singrauli (NTPC)

At Singrauli Superthermal Power Station, I worked with Mr. S. K. Dasgupta, an old colleague from Barauni Refinery. Our shared background as shift-charge engineers of captive power plants created a brotherly bond. Together, NTPC and BHEL worked as a single pool of experts, commissioning five 200 MW units in just two years—a record then. The lesson was clear: when both sides stop drawing boundaries, teamwork achieves extraordinary results.


Empowerment at Wanakbori (GEB)

At Wanakbori Thermal Power Station, I worked under the late Mr. K k Dharangdharia, who valued my frankness in admitting weaknesses. He gave me freedom to plan erection and commissioning. GEB contractors even sought my advice directly. This empowerment led us to synchronize to full load within just 24 hours, a record that brought rewards from GEB. The takeaway: empowerment and mutual respect are the cornerstones of customer confidence.


Friendship at Vizag Steel Plant

At Vizag Steel Plant, Mr. P. K. Chakraborty, Chief Engineer, became a family friend. We worked shoulder to shoulder during crises, and his support was always strengthened by Mr. B. N. Rath, CMD, who stood by us. Beyond the workplace, badminton became a bridge—Mr. Rath, a passionate player, would often come to my flat to pick me up, and we would proceed together to the CISF court. His closeness with me helped smoothen many inter-departmental issues. This reminded me that personal friendship often paves the way for professional harmony.


Memories from Indian Oil Days

This bond through sport reminded me of my Indian Oil days, when Mr. G. S. Harnal, DGM at Gauhati, would pick me up for badminton while I was still a trainee. Later in Barauni, our sporting bond gave me visibility and acceptance in the refinery community. A small reminder that shared passions outside the workplace create lasting professional goodwill.


Farakka Superthermal (NTPC) – Overcoming Trade Union Challenges

My last site posting was at Farakka Superthermal Power Station (1991–1994), where Mr. G. S. Sohal, GM NTPC, was already a close friend from our Singrauli days. Bengal was turbulent then—frequent bandhs and aggressive trade unionism tested progress. But our coordination and trust enabled us to commission 2×500 MW successfully. The experience reinforced that personal bonds act as shock absorbers in volatile environments.


ER HQ and Kathalgudi (NEEPCO)

Later, at BHEL Eastern Region HQ, my association with Mr. P K Kataki, Chairman of NEEPCO, proved invaluable. He was an IIT Kharagpur alumnus, like me, which gave us an instant connection. With his assurance, we tackled the Kathalgudi combined cycle project despite the looming ULFA menace. His back-channel talks even convinced insurgents that the project would ease Assam’s power woes. This was an extraordinary example of how leaders use trust and credibility to create security for execution teams.


Beyond Retirement – Suzlon Experience

After retirement, I applied the same principle while working with Techno Electric Engineering. With Mr. P. P. Gupta the owner and Chairman of TEECL, I forged bonds with late Mr. Tulsi Tanti of Suzlon and his chief marketing strategist Mr. I. C. Mangal initially Mr Gupta forged personal equation with Mr.Tanti. Their personal trust in me helped us overcome hurdles during the execution of our 211 MW wind power project. Once again, it proved that relationship capital is often more valuable than financial capital.


Rokhia Plant – Tripura

Another example was the Rokhia Plant in Tripura, where circumstances were especially difficult due to logistical challenges and local sensitivities. The cooperation between the state authorities, project leadership, and our team was not just contractual—it was built on trust and shared commitment. The Chief Engineer on the customer side worked with me almost like a partner, not as a counterpart across the table. Our alignment to the common goal of completing the project for Tripura’s power needs helped us overcome supply delays, terrain issues, and resource constraints. The experience showed once more that relationships built on mutual trust make even remote and complex projects achievable.


The Core Principle

Across all these experiences, one dictum consistently stood out:

In each case, the ultimate goal of both sides was the same — successful completion of the project. Once this shared goal was recognized, both sides naturally aligned themselves to it, transcending the narrow confines of contractual terms.

Two persons may sit on opposite sides of the table, but a common bridge can always be built. That bridge—be it technical trust, personal integrity, or even a shared love for badminton—transforms a transactional relationship into a partnership. When that happens, obstacles turn into opportunities, and projects turn into milestones.